Commerce Building

The 201 Commerce is a warehouse distribution center in West Valley Utah. We fabricated and delivered 159 tons of steel for the 307,000 square foot building in five months. We also erected the steel for the building.

We provided the joist and decking, miscellaneous metals, structural steel, stairs and galvanized handrails, and roof and cage ladders. This included a highway guard rail that we were not used to making. We found a material supplier and modified our process to fulfill what the designers envisioned.

“We had to erect the building while they were erecting the tilt-up panels. The building also has a protected floor, and we had to take extra caution during erection.”

Justin Noorda, Lundahl Ironworks Project Manager

There were no fabrication errors throughout this job, and the bolting up process went extremely quickly.

Myraid Office Building

We provided the steel for Myraid Genetics Building VI including an adjacent parking structure. A total of 1005 Tons was fabricated and delivered to Salt Lake City in 7 Months. We integrated joist and deck, supplied structural steel framing, and built state-of-the-art features to accommodate the eyes and workability of the building.

Wide angle drone shot of the Myraid building
Myraid Facility

“We really are blessed with a phenomenal fabrication team and production team. They work well together, they work well with us, and they bend over backward for our clients to try to make sure that we hit those schedules. We always know there’s going to be changes and adjustments, so it’s good to have that team behind us to help us hit those timelines.”

– Tyler Scott, Director of Project Management & Estimating

There were a lot of RFIs for this project. Some clarifications needed to be made that cost a bit of additional time. The design team was very flexible and kept to the schedule allowing the shop team to work their magic. The project management team did an amazing job to coordinate with the design to make sure everything went smoothly.

Path Structure at Myraid

With the new designs, we were forced to re-detail certain areas. To limit waste and save money, we both shortened and increased beam size in certain spots. We hit a snag when the galvanizing facilities in Utah were backed up six weeks and we only had two to work with. Fortunately, we were able to work together with a facility in Seattle and were able to deliver our steel to them and bring it back to the project site on schedule.

With our turn-key solutions, we are a one-stop shop for clients. We are able to do everything from the anchor bolts to the structural steel, the ornamental steel, wall features including priming and painting, non-ferrous metalwork, and more. 

Stairs at Myraid

“Myraid Genetics Building VI is now part of Myraid’s campus located at the University of Utah Research Park and will allow the company to expand and grow further. “I can see Myriad Genetics and their customers and employees benefiting from this facility for years and years to come.”

– Scott

Kraken Community Iceplex

The Kraken Community Iceplex is a 172,000 square foot activity complex in Seattle, Washington. We provided 1700 tons of steel in 8 months and delivered it to the site.

An accelerated schedule combined with a unique order of this magnitude made it difficult. We were very proactive and had clear lines of communication to make sure that the project goals were accomplished.

“The joists on this building are very large, there are three different areas with an office building and a front entry area. That’s unique and something that Lundahl has never done before.”

Braydon Smith, Lundahl Ironworks Project Manager

Close coordination between our fabrication and delivery team with the erection team was necessary to negate any down time and allow a smooth process.

“The way Lundahl Ironworks is set up, we’re able to adjust and continue at the fast-paced schedule, even with the uniqueness of this building, to be able to move forward quickly and produce a product that the customer was expecting.”

Braydon Smith, Lundahl Ironworks Project Manager

Kraken Community Iceplex is now open to the community and drawing fans closer to the sports they love.

Issaquah Middle School

(Cougar Mountain Middle School)

We worked to provide the steel for Issaquah Middle School. In 7 months, we fabricated and delivered 1800 tons of steel 784 miles to the site in Issaquah, Washington. It was a great opportunity to shine at what we do best – custom structural, miscellaneous metal fabrication, and ornamental steel. 

Picture of Construction of Issaquah Middle School

The highlight of this project was the unique trusses spanning up to 80-0. These trusses needed to be custom-designed, with an extremely low tolerance due to the tie in points

“We arranged trusses that were from 55 to 80 feet long. It was extremely difficult because logistically we had shipping and  fabrication issues because of the size. However, our production team knocked it out of the ballpark being able to fabricate these and getting all the proper permits.”

Justin Noorda, Lundahl Ironworks Project Manager
Picture of Steel Beams

The project needed both ferrous and nonferrous materials. That combined with a tight timeframe on delivery and no laydown room at the project site made it a very complex project.

We developed a clear upfront plan to create open lines of communication and immediate information relay. It required in-depth collaboration with the general contractor to accomplish such a difficult task. Cougar Mountain Middle School is now open to the public and will serve the community for many years to come.