Boise Airport Pedestrian Bridge
We are proud to announce the completion of the Boise Airport Project in Boise ID. Thanks to our partnership with DMS Steel Erectors and McAlvain Companies, Inc., we were able to fabricate, deliver, and erect a 60-ton pedestrian bridge, spanning approximately 145 ft, as well as 2 neighboring parking garages. This project was completed on-time and within budget.
Thank you to our partners and team for making this project a success!
Issaquah Elementary School
Innovation Pointe
Washington County Admin Building
DSU Stadium Expansion
Thomas Jefferson High School
Commerce Building
The 201 Commerce is a warehouse distribution center in West Valley Utah. We fabricated and delivered 159 tons of steel for the 307,000 square foot building in five months. We also erected the steel for the building.

We provided the joist and decking, miscellaneous metals, structural steel, stairs and galvanized handrails, and roof and cage ladders. This included a highway guard rail that we were not used to making. We found a material supplier and modified our process to fulfill what the designers envisioned.

“We had to erect the building while they were erecting the tilt-up panels. The building also has a protected floor, and we had to take extra caution during erection.”
Justin Noorda, Lundahl Ironworks Project Manager
There were no fabrication errors throughout this job, and the bolting up process went extremely quickly.
Myraid Office Building
We provided the steel for Myraid Genetics Building VI including an adjacent parking structure. A total of 1005 Tons was fabricated and delivered to Salt Lake City in 7 Months. We integrated joist and deck, supplied structural steel framing, and built state-of-the-art features to accommodate the eyes and workability of the building.

“We really are blessed with a phenomenal fabrication team and production team. They work well together, they work well with us, and they bend over backward for our clients to try to make sure that we hit those schedules. We always know there’s going to be changes and adjustments, so it’s good to have that team behind us to help us hit those timelines.”
– Tyler Scott, Director of Project Management & Estimating
There were a lot of RFIs for this project. Some clarifications needed to be made that cost a bit of additional time. The design team was very flexible and kept to the schedule allowing the shop team to work their magic. The project management team did an amazing job to coordinate with the design to make sure everything went smoothly.

With the new designs, we were forced to re-detail certain areas. To limit waste and save money, we both shortened and increased beam size in certain spots. We hit a snag when the galvanizing facilities in Utah were backed up six weeks and we only had two to work with. Fortunately, we were able to work together with a facility in Seattle and were able to deliver our steel to them and bring it back to the project site on schedule.
With our turn-key solutions, we are a one-stop shop for clients. We are able to do everything from the anchor bolts to the structural steel, the ornamental steel, wall features including priming and painting, non-ferrous metalwork, and more.

“Myraid Genetics Building VI is now part of Myraid’s campus located at the University of Utah Research Park and will allow the company to expand and grow further. “I can see Myriad Genetics and their customers and employees benefiting from this facility for years and years to come.”
– Scott
Kraken Community Iceplex
The Kraken Community Iceplex is a 172,000 square foot activity complex in Seattle, Washington. We provided 1700 tons of steel in 8 months and delivered it to the site.

An accelerated schedule combined with a unique order of this magnitude made it difficult. We were very proactive and had clear lines of communication to make sure that the project goals were accomplished.
“The joists on this building are very large, there are three different areas with an office building and a front entry area. That’s unique and something that Lundahl has never done before.”
Braydon Smith, Lundahl Ironworks Project Manager

Close coordination between our fabrication and delivery team with the erection team was necessary to negate any down time and allow a smooth process.

“The way Lundahl Ironworks is set up, we’re able to adjust and continue at the fast-paced schedule, even with the uniqueness of this building, to be able to move forward quickly and produce a product that the customer was expecting.”
Braydon Smith, Lundahl Ironworks Project Manager
Kraken Community Iceplex is now open to the community and drawing fans closer to the sports they love.